Address:

Tehran, Tehranpars, Hakimieh, Bahar Blvd., Abbaspour Engineering Campus, Beheshti University

Contact phone:

02173932550

02173932551

Email:

info@astransfo.com

Redesign and construction of 7.7 kV, 7MVA transformer for Golgohar Pelletizing Plant 2

The construction of a 7.7 kV, 7MVA transformer for the No. 2 pelletizing plant of Golgohar Steel, Sirjan, was carried out with the aim of providing reliable electricity to industrial equipment. This transformer was designed and manufactured based on the technical needs and operating conditions of the factory. The use of high-quality equipment and materials plays an important role in increasing the efficiency and stability of the system. The manufacturing process is carried out in accordance with valid electrical industry standards. This project will improve the performance of production lines and reduce the risk of power outages. Ultimately, the construction of this transformer is an effective step in strengthening the electrical infrastructure of the Golgohar Steel Pelletizing Plant in Sirjan.