This test is one of the most important methods for detecting the amount of insulation losses and identifying hidden defects in the transformer. Using the Tettex three-piece device provides high accuracy in measuring and analyzing results. Performing the tangent delta test plays an effective role in preventing sudden failures. At the Bandar Abbas Thermal Power Plant, this test is carried out in accordance with technical and safety standards. The results obtained are the basis for decision-making for preventive maintenance and extending the life of transformers.




Smartening industries for greater efficiency and energy sustainability
With modern transformer technologies, we pave the way for industries to optimize energy consumption, increase efficiency, and develop sustainably.
Products
Reliable service and superior quality
All kinds of electrical and electromagnetic devices, smart and distribution transformers, power, special, induction furnaces, reactors, generators for power plants and electric motors, power electronics systems, speed and electric vehicles
Click here
Education
Improving skills and developing knowledge
Holding entrepreneurship and short-term specialized courses and providing relevant certificates
Click here
Research and Development
Improving efficiency, innovation and data analysis
Importing and exporting related machinery and equipment, concluding contracts with natural and legal persons, both domestic and foreign, participating in government and non-government auctions and tenders, obtaining loans and credit from banks in the country.
Click here
- projects


Design and manufacture of 4 special 2500kVA transformers


Design and manufacture of 1250kVA, 20kV/600V transformer for Tabriz Gas Mixing Company


Testing of 20MVA transformer at Bandar Abbas Thermal Power Plant
Testing the 20MVA transformer of the Bandar Abbas Thermal Power Plant is one of the critical steps in ensuring the safe and stable operation of this important equipment. These tests are performed to check the insulation health, electrical and mechanical efficiency of the transformer. Performing tests correctly plays an important role in increasing network reliability and preventing unwanted outages. At the Bandar Abbas Thermal Power Plant, testing of the 20-megavolt-ampere transformer is carried out in accordance with international standards. The results of these tests help identify potential defects before operation. Ultimately, accurate transformer testing increases equipment life and reduces repair costs.


Tangent Delta Testing of Transformers of Bandar Abbas Thermal Power Plant with Three-Piece Tetex Machine


Testing of 400MVA transformer at Bandar Abbas Thermal Power Plant
Testing of the 400MVA transformer of the Bandar Abbas Thermal Power Plant was carried out as one of the most important maintenance and operation measures. These tests are carried out to check the electrical, mechanical performance, and insulation condition of the transformer. Running tests plays a key role in ensuring network stability and preventing widespread outages. At the Bandar Abbas Thermal Power Plant, testing of the 400 megavolt-ampere transformer is carried out in accordance with international standards. The results allow for early identification of potential defects. Ultimately, performing accurate tests will increase the life of the transformer and reduce repair costs.


Redesign and construction of 7.7 kV, 7MVA transformer for Golgohar Pelletizing Plant 2
The construction of a 7.7 kV, 7MVA transformer for the No. 2 pelletizing plant of Golgohar Steel, Sirjan, was carried out with the aim of providing reliable electricity to industrial equipment. This transformer was designed and manufactured based on the technical needs and operating conditions of the factory. The use of high-quality equipment and materials plays an important role in increasing the efficiency and stability of the system. The manufacturing process is carried out in accordance with valid electrical industry standards. This project will improve the performance of production lines and reduce the risk of power outages. Ultimately, the construction of this transformer is an effective step in strengthening the electrical infrastructure of the Golgohar Steel Pelletizing Plant in Sirjan.
Why us?
Activities of Aria Smart Transformer Company
Carrying out knowledge-based engineering activities in various fields of electrical engineering and related systems and devices, researching, designing, manufacturing, servicing, testing, troubleshooting and repairing various types of electrical and electromagnetic devices, especially various types of smart, distribution, power and special transformers and transformers for induction furnaces and reactors and generators for power plants and electric motors, designing, manufacturing, repairing and importing and exporting various types of power electronic systems and speed control systems and electric vehicles, holding specialized short-term and entrepreneurship courses and providing relevant documents, providing planning and consulting, supervision and engineering activities in the field of industrial projects and importing and exporting relevant machinery and equipment, and concluding contracts with natural and legal persons, both domestic and foreign, and participating in government and non-government auctions and tenders, and obtaining loans and credit from the country’s banks if necessary after obtaining the necessary permits from the relevant authorities.
- تیم مدیریت
ترانسفورماتور هوشمند آریا با هدف ارتقای شبکه برق هوشمند و بهبود بهرهوری انرژی طراحی و تولید شده است. این محصول با قابلیت پایش هوشمند، قیمتگذاری شفاف و عرضه مستقیم از سوی کارخانه، در پروژهها و مناقصات داخلی و خارجی برای تأمین نیاز سازمانهای دولتی و خصوصی ارائه میشود. معرفی این ترانسفورماتور در دفتر مرکزی و نمایشگاه دائمی شرکت، نشاندهنده تمرکز بر ارائه راهکارهای نوین و بومی در صنعت برق کشور است.
- آخرین مقالات
Determining the principles of detecting ring connection in transformers
در این پروژه، اصول تشخیص اتصال حلقه در ترانسفورماتورهای قدرت با استفاده از تست تقسیم شار مغناطیسی تبیین شده است. این بررسی همراه با انجام آزمایشهای عملی و مدلسازی دقیق ...
Modeling of Axial Forces on Radial Spacers of Transformer
In this study, axial forces acting on radial spacers of transformer disk windings due to inrush current are modeled using the 2-D axisymmetric finite element method. The proposed model provides ...